AA321.01320

Steel pipe shoring

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Over 3.5m to 4.2m or less, 3 months or less
Unit
void m3
H2 2026 Unit Price
19,606 KRW
Labor Ratio
92 %

Unit Price Definition

① Based on the installation and dismantling of steel pipe shoring (installation spacing over 0.6m). ② Includes the installation and dismantling of walers, but excludes ground leveling and concrete placing for shoring installation. ③ Includes material costs (including consumable materials) and installation costs. ④ Horizontal connecting members are based on one-tier installation.

Unit Price Adjustment

- According to shoring installation spacing and height, apply by multiplying the above unit price and labor ratio by the coefficients in the table below. Classification installation spacing 0.6m or less installation spacing over 0.6m 2.5m or less 1.21 1.00 Standard market unit price over 2.5m∼3.5m or less 1.20 1.00 over 3.5m∼4.2m or less 1.20 1.00 2.5m or less 0.99 1.00 Labor ratio over 2.5m∼3.5m or less 0.99 1.00 over 3.5m∼4.2m or less 0.99 1.00 ※ Installation spacing is based on waler spacing.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.