System shoring
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Over 20m to 30m or less
- Unit
- void m3
- H2 2026 Unit Price
- 28,994 KRW
- Labor Ratio
- 95 %
Unit Price Definition
① This is based on the installation and dismantling of system shoring (installation spacing over 0.6m to 1.2m or less). ② It includes the installation and dismantling of joists, but excludes ground leveling and concrete placing for shoring installation. ③ Purchase and transportation costs of system shoring and joist materials are excluded.
Unit Price Adjustment
- Apply by multiplying the above unit price and labor cost ratio by the coefficients in the table below according to the installation spacing. Installation spacing 0.6m or less 0.6m~1.2m Over 1.2m Standard market unit price 1.20 1.00 0.90 Labor cost ratio 1.00 1.00 1.00 ※ Installation spacing is based on waler spacing.
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.