Euro form
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Standard, 0∼7m
- Unit
- m2
- H2 2026 Unit Price
- 40,030 KRW
- Labor Ratio
- 80 %
Unit Price Definition
① This item is based on the assembly and dismantling of wall-form Euro-form panels. ② It includes formwork installation and dismantling, and maintenance during work (cleaning, application of release agent, formwork repair). ③ Surface finishing (grinding after stripping) is excluded. ④ Formwork material cost (including material loss rate and premium) is included, but form-tie material cost is excluded. ⑤ Applicable to formwork installation height of 7m or less; when exceeding 7m, add 10% to labor cost for every additional 3m. (If equipment is required depending on site conditions, lifting equipment charges shall be separately calculated, and labor cost shall not be added.) ⑥ For application criteria by specification, refer below. Category Type Simple Simple structures such as building mat foundations Standard General interior/exterior walls, boxes, etc. Complex Structures that are complex like beams/columns and require much reinforcement, or cases requiring form-tie installation
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.