Sidewalk block removal/Equipment demolition
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- B-Type
- Unit
- m2
- H2 2026 Unit Price
- 3,127 KRW
- Labor Ratio
- 85 %
Civil works
DC23* Demolition of existing structures /Sidewalk blocks
Search in Explorer
Original Notice
Unit Price Definition
① Manual demolition is based on demolition work in sections where equipment cannot be used. ② Equipment demolition is based on demolition work in sections constructed using a combination of labor and equipment. ③ Includes block removal and site cleanup work. ④ Excludes loading, hauling, and waste disposal costs for the demolished materials. ⑤ For applicable types by specification, refer to the following. Classification Type A-Type Sections where equipment movement and loading are easy, such as parks, complexes, and sidewalks in housing site development works B-Type Sections where equipment movement and loading space are limited, such as sidewalks adjacent to roadways and in residential areas
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.