Earth excavation/Blasted rock/Precision vibration-controlled blasting
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Including secondary breaking
- Unit
- m3
- H2 2026 Unit Price
- 27,161 KRW
- Labor Ratio
- 58 %
Unit Price Definition
① The classification of work item names shall follow the MOLIT 'Road Construction Open Blasting Design and Construction Guidelines'. Vibration-controlled blasting Precision vibration control Non-vibration excavation General blasting Large-scale blasting Controlled blasting Small-scale Medium-scale Method overview A method that reduces vibration to a level that causes cracking in rock with a small amount of explosives around protected objects, followed by secondary breaking with a large breaker A method applied when protected objects exist within the blasting impact zone, where blasting design is carried out based on 'test blasting' results so that regulatory standards can be met A method in which the maximum charge per hole within the blasting impact zone can satisfy blasting vibration regulatory standards A method applied in mountainous remote areas, etc. within the blasting impact zone where no protected objects exist at all, considering only blasting efficiency A method in which secondary breaking is performed with a large breaker for zones separated from protected objects ② Includes drilling, charging and stemming fill, blast line installation, blast protection work, blasting, loosening of blasted rock, and stockpiling work. ③ Non-vibration excavation and precision vibration-controlled blasting include secondary breaking work with a large breaker (including secondary breaking). ④ Consumable material costs (bit, rod, shank rod, sleeve, chisel) are included. ⑤ Explosive material costs (explosives, detonator, stemming material) and loading and hauling costs for off-site disposal are excluded. ⑥ Surface trimming costs of the excavation face are excluded and shall be separately counted when necessary. ⑦ The volume conversion factor has already been reflected and applies to soil volume in the natural state.
Earth excavation/Blasted rock/Non-vibration excavation
Earth excavation/Blasted rock/Small-scale vibration-controlled blasting
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.