Manual excavation/Common soil/1m or less
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Poor
- Unit
- m3
- H2 2026 Unit Price
- 42,238 KRW
- Labor Ratio
- 100 %
Unit Price Definition
① Based on manual excavation work at a depth of 1m or less from the excavation face. ② Excavation specification classification may be applied as follows. - Good: conditions with no work interference in excavation - Poor: conditions with many work interferences due to obstacles (temporary works, adjacent facilities, etc.) or narrow working space ③ Excludes shoring, dewatering, and loading and hauling costs for off-site disposal of excavated soil. ④ The volume conversion factor is already reflected and applies to soil quantity in natural condition.
Unit Price Adjustment
- Apply by multiplying the following coefficients according to groundwater occurrence. Category Standard market unit price Labor cost ratio Land 1.00 1.00 Groundwater 1.50 1.00
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.