This service is available to members only.

DG100.20000

Embankment/Earth

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Thickness 20cm
Unit
m3
H2 2026 Unit Price
3,148 KRW
Labor Ratio
55 %

Unit Price Definition

① Based on spreading and compaction work using earthwork equipment. ② Earth embankment includes watering cost for controlling the moisture content of the material. ③ Rock embankment is based on material in a broken-down state. ④ For the degree of compaction of earth embankment, refer to the following. Classification Thickness 30cm Thickness 20cm Degree of compaction (%) 90% or more 95% or more ⑤ Costs required for loading and hauling soil are excluded. ⑥ The volume conversion factor has already been reflected and is applied to soil volume in the compacted state.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.