Backfilling and compaction
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Small equipment
- Unit
- m3
- H2 2026 Unit Price
- 10,276 KRW
- Labor Ratio
- 63 %
Unit Price Definition
① Based on backfilling work for structures after excavation, and includes spreading, leveling, compaction, and watering work. ② Large equipment is based on the combined use of a vibratory roller (10ton class) and a small hand-guided roller. ③ Small equipment applies to work in narrow sections where the use of large equipment (vibratory roller) is difficult. ④ Costs required for loading and hauling soil are excluded. ⑤ The volume conversion factor has already been reflected and is applied to soil volume in the compacted state.
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.