Soil hauling / soil
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Dozer 32ton, (L=60m)
- Unit
- m3
- H2 2026 Unit Price
- 1,983 KRW
- Labor Ratio
- 20 %
Unit Price Definition
① This unit price is based on soil volume in its natural state. ② The cost for collection distance within 20m has been deducted as free haul. ③ This unit price applies to works with a construction scale (total executed volume obtained by summing the haul quantities of usable soil, waste soil, embankment fill, etc.) of 10,000m3 or more. ④ Apply the standard market price proportionally according to distance. However, for dozer haul distances of 30m or less, the same standard market price applies regardless of distance. 【Application criteria】 ① The correction criteria by soil type and equipment specification shall follow the table below. ㆍ Soil hauling (dozer) unit price = standard unit price × correction factor by soil type and equipment specification Equipment specification 32ton 19ton Soil classification Soil 1.00 1.20 Ripped rock 1.70 2.10 Blasted rock 3.30 4.00 ② The labor ratio shall follow the table below. ㆍ Soil hauling (dozer) labor ratio = standard labor ratio × correction factor by soil type and equipment specification Equipment specification 32ton 19ton Soil classification Soil 1.00 1.40 Ripped rock 1.00 1.40 Blasted rock 1.00 1.40
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.