This service is available to members only.

DJ311.02030

Thin growth-base material spray

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
T=3cm, weathered rock
Unit
m2
H2 2026 Unit Price
14,190 KRW
Labor Ratio
77 %

Unit Price Definition

① Based on mat installation and growth-base material spraying work for slope protection. ② Includes mat spreading, fixing pin installation, application of growth-base material, and finishing work. ③ Surface trimming and irrigation costs are excluded. ④ Material costs (mat, fixing pins, growth-base material, mixed seeds, etc.) are excluded. ⑤ Applicable to vertical heights of 20m or less.

Unit Price Adjustment

- When the vertical height exceeds 20m, apply by multiplying by the following coefficients. Thin growth-base material spray up to 20m 20~30m 30~50m over 50m T=1cm, soil 1.00 1.16 1.24 1.32 T=2cm, soil 1.00 1.16 1.23 1.31 Standard market unit price T=3cm, weathered rock 1.00 1.15 1.23 1.31 T=5cm, weathered rock 1.00 1.15 1.23 1.30 T=1cm, soil 1.00 1.03 1.05 1.06 T=2cm, soil 1.00 1.04 1.05 1.07 Labor cost ratio T=3cm, weathered rock 1.00 1.04 1.06 1.07 T=5cm, weathered rock 1.00 1.04 1.06 1.08

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.