DJ321.03070

Thick growth-base material spray

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
T=7cm, soft rock · ordinary rock · hard rock
Unit
m2
H2 2026 Unit Price
27,601 KRW
Labor Ratio
68 %

Unit Price Definition

① Based on installing an attachment net for spraying growth-base material on cut slopes, and spraying a mixture of growth-base material and seeds onto the slope. ② Includes spreading the attachment net (PVC coating), installing anchor pins and landing pins, spraying the growth-base material, and finishing work. ③ Includes drill and bit wear costs when drilling holes for anchor pins and landing pins, and excludes surface trimming costs. ④ Material costs (attachment net, anchor pins, landing pins, growth-base material, mixed seeds, etc.) are excluded. ⑤ Applicable to vertical heights of 20m or less.

Unit Price Adjustment

- When the vertical height exceeds 20m, apply by multiplying by the following coefficients. Thick growth-base material spray up to 20m 20~30m 30~50m over 50m T=5cm, soft rock · ordinary rock · hard rock 1.00 1.14 1.20 1.27 T=7cm,soft rock · ordinary rock · hard rock 1.00 1.14 1.20 1.27 Standard market unit price T=10cm,soft rock · ordinary rock · hard rock 1.00 1.14 1.20 1.27 T=15cm, soft rock · ordinary rock · hard rock 1.00 1.14 1.20 1.27 T=5cm, soft rock · ordinary rock · hard rock 1.00 1.06 1.08 1.10 T=7cm,soft rock · ordinary rock · hard rock 1.00 1.06 1.08 1.10 Labor cost ratio T=10cm,soft rock · ordinary rock · hard rock 1.00 1.06 1.08 1.10 T=15cm, soft rock · ordinary rock · hard rock 1.00 1.06 1.08 1.10

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.