DS100.10200

Soil hauling (loading/unloading) / soil

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Loader + dump 20 ton
Unit
m3
H2 2026 Unit Price
2,153 KRW
Labor Ratio
45 %

Unit Price Definition

① This unit price is based on soil volume in its natural state. ② Includes the costs required for loading, unloading, waiting time (the time from arrival at the loading place until loading work begins), installation and removal of the dump-bed cover, and passing through the wheel washer. ③ Based on soil hauling with loading after stockpiling, and includes loading costs by loader or excavator. ④ This unit price applies to works with a construction scale (total executed volume obtained by summing the haul quantities of usable soil, waste soil, embankment fill, etc.) of 10,000m3 or more.

Unit Price Adjustment

- Apply by multiplying the following factors according to whether the wheel washer is passed. Loader + dump Excavator + dump Equipment specification classification Soil Ripped rock Soil Ripped rock Blasted rock Standard market price 1.00 1.00 1.00 1.00 1.00 Wheel washer passed Labor ratio 1.00 1.00 1.00 1.00 1.00 Standard market price 0.90 0.92 0.93 0.96 0.97 Wheel washer not passed Labor ratio 1.00 1.00 1.00 1.00 1.00

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.