This service is available to members only.

DS101.20320

Soil hauling (loading/unloading) / soil

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Dump 32 ton
Unit
m3
H2 2026 Unit Price
2,754 KRW
Labor Ratio
35 %

Unit Price Definition

① This unit price is based on soil volume in its natural state. ② Includes the costs required for loading, unloading, waiting time (the time from arrival at the loading place until loading work begins), installation and removal of the dump-bed cover, and passing through the wheel washer. ③ This is the unit price for cases where soil excavated by an excavator is loaded directly onto a dump truck without separate loading equipment, and does not include excavation costs by the excavator. ④ This unit price applies to works with a construction scale (total executed volume obtained by summing the haul quantities of usable soil, waste soil, embankment fill, etc.) of 10,000m3 or more.

Unit Price Adjustment

- Apply by multiplying the following factors according to whether the wheel washer is passed. Classification Standard market price Labor ratio Wheel washer passed 1.00 1.00 Wheel washer not passed 0.91 1.00

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.