Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Standard, 0∼7m
- Unit
- m2
- H2 2026 Unit Price
- 40,249 KRW
- Labor Ratio
- 82 %
Unit Price Definition
① Based on wall assembly and dismantling work of Euro form panels. ② Includes formwork installation and dismantling, and maintenance during work (cleaning, application of release agent, formwork repair). ③ Surface finishing work (grinding after dismantling) is excluded. ④ Includes formwork material cost (including material loss rate and premium), but excludes form-tie material cost. ⑤ Applicable to formwork installation height of 7m or less; when exceeding 7m, add 10% to labor cost for every additional 3m. (If equipment is required depending on site conditions, separately calculate lifting heavy equipment charges and do not add labor cost.) ⑥ For applicable types by specification, refer below. Classification Type Simple Simple structures such as sluice or pipe foundations and mat foundations Standard Side ditches, waterways, retaining walls, general walls, box structures, etc. Complex Complex and heavily reinforced structures such as abutments and wing walls, or cases requiring form-tie installation
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.