Steel formwork (equipment used)
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- General
- Unit
- m2
- H2 2026 Unit Price
- 27,568 KRW
- Labor Ratio
- 85 %
Civil works
ED*** Steel formwork (equipment used) / excluding material cost
Search in Explorer
Original Notice
Unit Price Definition
① Based on equipment-assisted assembly installation and dismantling work of steel formwork. ② The general specification is based on repetitive work not requiring high-elevation work (beam fabrication, etc.), while the pier and coping specifications are based on high-elevation work for bridges. ③ Includes labor cost and lifting heavy equipment usage charges. ④ Excludes steel formwork material cost and the cost of timber for blocking and wedging.
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.