Facing brick (1.0B laying)
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Exceeding 3.6m
- Unit
- m2
- H2 2026 Unit Price
- 120,527 KRW
- Labor Ratio
- 98 %
Architecture
FA12* Brick work / Facing brick laying / Material cost excluded
Search in Explorer
Original Notice
Unit Price Definition
① Based on cavity laying of facing bricks (19×9×5.7㎝) (single-face finish). ② Includes layout marking, installation of gauge frame, installation of anchoring hardware, mortar mixing, brick laying, raking joints, and finished jointing work. ③ Based on dry cement mortar with completed mix; if mortar proportioning (cement, sand) is required, it shall be separately calculated. ④ Material cost is excluded. ⑤ For brick laying quantity per area (m2), 0.5B is based on 75 bricks and 1B on 149 bricks.
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.