PSC beam fabricated member
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Stressing (Ø12.7mm)
- Unit
- location
- H2 2026 Unit Price
- 68,729 KRW
- Labor Ratio
- 90 %
Unit Price Definition
① Includes the required costs by PSC beam fabrication component (beam bed, anchorage, sheath duct, strand installation, stressing, grouting, steel formwork). ② Beam bed installation includes the cost of installing the fabrication bed; if foundation work such as concrete placing is required, it shall be calculated separately. Material costs for the beam bed (timber, boards, angle brackets, nails) are excluded. ③ Anchorage installation includes anchorage fixing and installation work, and material costs are excluded. ④ Sheath duct installation includes cutting and assembly of the sheath duct, insertion and removal of sheath protective hose, and material costs are excluded. ⑤ Strand installation includes strand insertion and cutting work, and material costs are excluded. ⑥ Stressing is based on stressing from both sides, and includes anchor head and wedge installation, stressing and cutting work, and material costs are excluded. ⑦ Grouting includes injection hose installation and grouting preparation, cement mixing and injection work, and material costs are excluded. ⑧ For installation of steel formwork for beam fabrication, apply the standard market unit price of the applicable specification under “Major Category E. Cast-in-Place Concrete Work / ED*** Steel Formwork / Excluding Material Cost”.
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.