This service is available to members only.

FB122.00120

Reinforced concrete block masonry (150*190*390)

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Double-side finish, 3.6m or less
Unit
m2
H2 2026 Unit Price
41,747 KRW
Labor Ratio
98 %

Unit Price Definition

① Based on running bond masonry with filled vertical joints at every 2 courses of concrete blocks (spacing 800mm). ② Includes layout marking, installation of guide frames, mortar mixing, installation of wire mesh and fixing hardware, cutting and installation of reinforcing bars, block laying, mortar filling, joint pressing, and finishing work. ③ Material cost is excluded.

Unit Price Adjustment

- (Filling) When filling is performed at every block course (spacing 400mm), apply by multiplying the following factor. Classification Unit price Labor ratio Filling at every block course 1.05 1.00 - (Block laying) When blocks are laid with closed vertical joints, apply by multiplying the following factor. Classification Unit price Labor ratio Closed vertical joint laying 0.93 1.00

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.