Flexible joint installation
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- ø15∼ 25mm
- Unit
- ea
- H2 2026 Unit Price
- 12,884 KRW
- Labor Ratio
- 98 %
Unit Price Definition
① This is based on the installation of a flexible joint for vibration absorption in mechanical equipment piping. ② It includes selection of installation location, leveling, control rod installation, and piping test. ③ Material cost of the flexible joint is excluded. ④ Tool loss and machine expenses for light equipment (welding machine, etc.) are included.
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.