Pressure gauge (for steel pipe)
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- D100mm 2-35 kg/cm2
- Unit
- ea
- H2 2026 Unit Price
- 26,515 KRW
- Labor Ratio
- 97 %
Unit Price Definition
① Based on installation of mechanical equipment flow meters, pressure gauges, and heat meters. ② Installation of a direct-reading flow meter includes temporary piping removal, flow meter installation, operation test, and finishing work. ③ Installation of a remote flow meter includes temporary piping removal, flow meter installation, conduit wiring connection, testing and inspection. ④ Installation of a heat meter includes temporary piping removal, installation of the heat meter and temperature sensor, conduit wiring connection, testing and inspection. ⑤ Material costs for flow meters and protective sleeves, pressure gauges, and heat meters are excluded. ⑥ Conduit piping and wire pulling, and indicator installation shall be separately measured. ⑦ Tool loss expenses and machine costs for light equipment are included.
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.