This service is available to members only.

HC310.01010

Precast U-shaped flume

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
50kg/unit or more ~ less than 150kg/unit
Unit
m
H2 2026 Unit Price
8,171 KRW
Labor Ratio
69 %

Unit Price Definition

① Based on installation of precast U-shaped flume (waterway, side ditch, others). ② Includes flume installation and joint mortar finishing. ③ Excavation, foundation (concrete, gravel, sand), ground leveling, and backfilling work are excluded. ④ Includes the cost of consumable materials (joint mortar, etc.). ⑤ Material cost of U-shaped flume is excluded.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.