This service is available to members only.

LD142.02000

Concrete surface layer machine placement

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Small equipment
Unit
m3
H2 2026 Unit Price
17,753 KRW
Labor Ratio
54 %

Unit Price Definition

① This is based on surface layer placement work of concrete pavement using equipment (concrete paver). ② It includes separator membrane installation (vinyl sheet laying), reinforcement installation (dowel bars, tie bars, etc.), concrete placing, surface finishing, and curing. ③ Purchase and transportation costs of ready-mixed concrete, vinyl sheet, reinforcement, and curing materials are excluded. ④ Assembly and dismantling costs of equipment are excluded. ⑤ For application types by specification, refer below. Classification Type Large equipment Use of concrete paver equipment of 300㎾ class Small equipment Use of concrete paver equipment of 160㎾ class

Unit Price Adjustment

- Apply by multiplying the following coefficients according to construction location. Airport pavement Classification General pavement Tunnel pavement Continuous placement Discontinuous placement Standard market unit price 1.00 1.17 1.09 1.18 Large equipment Labor ratio 1.00 1.00 1.00 1.00 Standard market unit price 1.00 1.11 1.09 1.18 Small equipment Labor ratio 1.00 1.00 1.00 1.00 - The application criteria for airport pavement are as follows. 1) Based on placement with pavement thickness of 40~50cm. 2) Discontinuous placement refers to cases where continuous placement is impossible because movement occurs frequently due to obstacles such as catch basins and foundations.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.