LH114.20220

Curtain wall glass installation

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
22mm or less
Unit
m2
H2 2026 Unit Price
31,877 KRW
Labor Ratio
97 %

Unit Price Definition

① Standard for attaching insulating glass to the curtain wall frame using structural silicone. ② Includes Norton tape installation, glass setting, application of structural sealant and waterproof sealing material, glass cleaning, and finishing work. ③ The cost of main materials (glass, sealing materials) is excluded, while the cost of auxiliary materials (gaskets, boiled oil, etc.) is included. ④ Scaffolding erection and use of an aerial work platform, where required, shall be separately calculated.

Unit Price Adjustment

- When scaffolding is used, apply the unit price and labor cost ratio by multiplying by the coefficients in the table below according to height. Classification Standard Market Unit Price Labor Cost Ratio 1st to 3rd floor 1.00 1.0 4th to 6th floor 1.05 1.0 7th to 9th floor 1.08 1.0 10th to 12th floor 1.12 1.0 13th to 15th floor 1.16 1.0 16th to 18th floor 1.20 1.0 19th floor and above add 0.04 for every additional 3 floors 1.0 ※ If floors cannot be distinguished on the exterior wall, convert the number of floors based on a floor height of 3.6m, and apply the same conversion to interior wall height using 3.6m as the standard.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.