Waterborne paint/Manual
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Crosswalk, parking lot
- Unit
- m2
- H2 2026 Unit Price
- 3,545 KRW
- Labor Ratio
- 74 %
Unit Price Definition
① This is based on lane marking work for new road construction. ② Waterborne paint includes lane marking and glass bead spreading work. ③ Thermoplastic paint includes paint mixing, lane marking, and glass bead spreading work. ④ Includes costs for moving materials and equipment during construction. ⑤ Material costs (paint, glass beads, propane gas, primer) are excluded. ⑥ For applicable types by specification, refer to the following. Classification Applicable type Manual Lane marking using a hand-guided line marker Mechanical Lane marking using a self-propelled line marker truck
Unit Price Adjustment
- Apply by multiplying the following coefficients according to the construction location. Where delineator studs, etc. are installed on the road surface and work productivity decreases Classification General section Standard market price 1.00 1.10 Labor ratio 1.00 1.00
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.