Protective fence guardrail post installation
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Post spacing 2m
- Unit
- m
- H2 2026 Unit Price
- 4,329 KRW
- Labor Ratio
- 72 %
Unit Price Definition
① Post installation is based on guardrail post installation in earthwork sections along the roadside. ② Post installation includes reference line setting, post driving, and reinforcement installation. ③ Rail panel installation is based on installation of a 4m-long guardrail panel per section. ④ Rail panel installation includes spacer assembly, panel installation and bolt fastening, end rail installation, and finishing work. ⑤ Material costs (posts, panels, bolts, nuts, etc.) are excluded. 【Reference】 - The guardrail panel shapes are as follows. <2W-type guardrail> <3W-type guardrail>
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.