Rockfall protection net
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- Mechanical
- Unit
- m2
- H2 2026 Unit Price
- 8,228 KRW
- Labor Ratio
- 87 %
Unit Price Definition
① This is based on foundation drilling work and the installation of wire mesh and wire rope for the installation of rockfall protection nets (pocket type and non-pocket type). ② It includes foundation drilling, insertion of fixing pins and anchor bolts, filling with grouting material, installation of wire mesh, installation and connection of wire rope, and fixing of assembly fittings. ③ Material costs (wire mesh (PVC-coated mesh), wire rope, binding wire, assembly fittings, assembly fitting grouting material (epoxy), etc.) are excluded. ④ Slope trimming is excluded.
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.