NG203.50000

Texture coat

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
4 coats, concrete, ceiling
Unit
m2
H2 2026 Unit Price
18,893 KRW
Labor Ratio
96 %

Unit Price Definition

① This item is based on spray application of texture coat and stone-finish paint. ② Texture coat includes 4-coat application: 2 primer coats (roller application), putty and sanding, 1 texture coat (spray application), and 1 top coating (roller application). ③ Stone-finish paint includes 1 spray coat on walls, and where a joint pattern exists, includes installation of the joint pattern. ④ Auxiliary brush work in roller application is included. ⑤ Tool expenses and consumables (masking tape, etc.) are included. ⑥ Material costs (paint, thinner, etc.) are excluded. ⑦ Surface preparation, protection work for spray application, and dust-scattering prevention facilities (dust screens, etc.), if required, shall be measured separately. ⑧ Spray application is based on indoor work and low-rise exterior walls; this unit price shall not be applied to high-rise exterior walls where installation of dust-scattering prevention facilities (dust screens, etc.) is difficult.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.