This service is available to members only.

OB110.20000

Wallpaper hanging

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Concrete and mortar surface/Wall
Unit
m2
H2 2026 Unit Price
5,993 KRW
Labor Ratio
96 %

Unit Price Definition

① Based on applying lining paper and finish wallpaper to the base wall surface. ② Includes paste application, wallpaper cutting, lining paper application, and finish wallpaper application. ③ Main material cost (wallpaper) is excluded. ④ Incidental material cost (paste, etc.) is included. ⑤ For wallpapering methods by specification, refer below. Classification Wallpapering method Lining paper Strip backing attachment Plywood・gypsum board surface Finish wallpaper Full-surface application Lining paper Bag lining attachment Concrete・mortar surface Finish wallpaper Full-surface application

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.