OD010.60200

Insulation attachment during concrete placement / wall, floor

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
t=200mm or less
Unit
m2
H2 2026 Unit Price
9,644 KRW
Labor Ratio
97 %

Unit Price Definition

① This is based on the work of installing insulation on formwork surfaces (walls, floors). ② This is based on single-layer installation of insulation. ③ Includes insulation cutting and installation, and joint finishing (urethane foam filling, etc.). ④ Main material costs (insulation, urethane foam) are excluded. ⑤ Incidental material costs (nails, etc.) are included.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.