RB101.05500

Stone masonry / Dry masonry

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Back length 55cm or less
Unit
m2
H2 2026 Unit Price
64,395 KRW
Labor Ratio
74 %

Unit Price Definition

① This unit price is the standard for stone masonry using broken stone and crushed rubble with an excavator. ② It applies where the slope is steeper than 1:1 and the height is 3m or less. ③ Mortared masonry includes installation of guide frames, stone masonry, concrete filling, drainage pipe installation, and joint filling work; dry masonry includes installation of guide frames, stone masonry, rubble filling, and drainage pipe installation. ④ Foundation compaction and backfilling are excluded. ⑤ Material cost (facing stones, fill concrete, etc.) is excluded.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.