RB501.03500

Stone pitching / Mortared pitching

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Back length 35cm or less
Unit
m2
H2 2026 Unit Price
54,621 KRW
Labor Ratio
82 %

Unit Price Definition

① This unit price is the standard for stone pitching using broken stone and crushed rubble with an excavator. ② It applies where the slope is gentler than 1:1 and the height is 5m or less. ③ Mortared pitching includes installation of guide frames, stone pitching, concrete filling, drainage pipe installation, and joint filling work; dry pitching includes installation of guide frames, stone pitching, rubble filling, and drainage pipe installation. ④ Foundation compaction and backfilling are excluded. ⑤ Material cost (facing stones, joint-filling stones, etc.) is excluded.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.