This service is available to members only.

AA310.02100

Temporary stairs

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Inclined type, up to 3 months
Unit
m2

Prices by Discipline

This work item code is published with different prices depending on the discipline. Please check the discipline of the relevant project and apply it accordingly.

DisciplineH2 2026 Unit PriceLabor Ratio
Civil works 132,049 KRW 71 %
Architecture 130,688 KRW 71 %

Unit Price Definition

① Inclined temporary stairs (temporary stair width 0.9m or less) are based on assembling, installing, and dismantling in an inclined form using prefabricated platforms and steel pipes at heights of 6m or less. ② The unit is based on the area of treads (including landings). ③ Includes the installation and dismantling of scaffolding and platforms, vertical protective nets around the scaffolding, and safety guardrails. ④ Includes the material cost of temporary stairs, but excludes the material cost of protective nets.

Unit Price Adjustment

- If the construction period exceeds 3 months, apply by multiplying the following coefficients. Inclined temporary stairs up to 3 months up to 6 months up to 12 months Standard market unit price 1.00 1.21 1.63 Labor ratio 1.00 0.83 0.61

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.