AA323.10600

System shoring

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Over 5m to 10m or less
Unit
void m3

Prices by Discipline

This work item code is published with different prices depending on the discipline. Please check the discipline of the relevant project and apply it accordingly.

DisciplineH2 2026 Unit PriceLabor Ratio
Civil works 22,665 KRW 97 %
Architecture 22,655 KRW 97 %

Unit Price Definition

① This is based on the installation and dismantling work of system shoring (installation spacing over 0.6m to 1.2m or less). ② It includes the installation and dismantling of walers, but excludes ground leveling and concrete placing for shoring installation. ③ The purchase and transportation costs of system shoring and waler materials are excluded.

Unit Price Adjustment

- Apply by multiplying the above unit price and labor cost ratio by the coefficients in the table below according to the installation spacing. Installation spacing 0.6m or less 0.6m~1.2m Over 1.2m Standard market unit price 1.20 1.00 0.90 Labor cost ratio 1.00 1.00 1.00 ※ Installation spacing is based on waler spacing.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.