This service is available to members only.

AD271.03000

Building protection

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Attaching timber
Unit
m2
H2 2026 Unit Price
12,061 KRW
Labor Ratio
65 %

Unit Price Definition

① This item is based on the work of installing and removing protective materials to prevent damage to and contamination of the work area. ② Nonwoven fabric laying is based on the work of laying protective material on the floor. ③ This item is based on the work of cutting protective sheets such as tarpaulin and corrugated cardboard and attaching them with tape. ④ Timber attachment is the standard for protecting the perimeter with boards and scantlings. ⑤ Material costs (nonwoven fabric, protective sheets, timber, etc.) are included.

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.