H-pile driving (electric)
Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
- Specification
- H=300×300, ℓ=5m or less
- Unit
- pc
- H2 2026 Unit Price
- 97,689 KRW
- Labor Ratio
- 68 %
Unit Price Definition
① This is based on the work of driving or extracting H-piles using a vibratory pile hammer. ② It includes work preparation, driving and extraction, finishing, and cleanup. ③ It includes the costs of the vibratory pile hammer, crane, and generator. ④ The purchase and transportation costs of H-pile materials and the cost of an auxiliary crane for short-distance transport are excluded. ⑤ The application criteria for driving or extraction are as follows. - Pile penetration length (ℓ) : length by each specification - Soil type : sandy soil and gravelly soil - Pile size (H) : 300×300
Unit Price Adjustment
- This unit price is based on cases where no interference occurs from adjacent facilities (houses, railways, roads, etc.) and sufficient space is secured for standing the pile. - Apply by multiplying the following coefficients according to the construction scale. Standard market unit price Labor cost ratio Classification Driving Extraction Driving Extraction Construction quantity 50 pcs or more 1.00 1.00 1.00 1.00 Construction quantity less than 50 pcs 1.07 1.06 1.00 1.00
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.