This service is available to members only.

DA001.01000

Plywood formwork

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
Simple, 0 ∼ 7m
Unit
m2
H2 2026 Unit Price
42,914 KRW
Labor Ratio
58 %

Unit Price Definition

① This item is based on the processing, fabrication, installation, and dismantling of plywood formwork. ② It includes formwork installation and dismantling, and maintenance during work (cleaning, application of release agent, formwork repair). ③ Shoring installation and surface finishing (filling form-tie recesses, grinding after stripping) are excluded. ④ Formwork material cost (including material loss rate and premium) is included, but form-tie material cost is excluded. ⑤ Costs for bolts, wood wedges, pipes, etc. required for architectural fair-faced finish are excluded. ⑥ Applicable to formwork installation height of 7m or less; when exceeding 7m, add 10% to labor cost for every additional 3m. (If equipment is required depending on site conditions, lifting equipment charges shall be separately calculated, and labor cost shall not be added.) ⑦ For application criteria by specification, refer below. Type Number of reuses Structure Very complex/Small-scale 1~2 times Fair-faced concrete, curved surfaces, and special shapes Complex 2 times Small and scattered structures such as masonry curbs, window sills, handrails, etc. Standard 3 times Beams and columns of building rigid-frame structures Simple 4 times Building slabs and general wall structures Simple 6 times Simple structures such as mat foundations

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.