This service is available to members only.

EC101.04052

Plain concrete placing / Pump truck

Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652

Specification
TYPE-4
Unit
m3
H2 2026 Unit Price
81,629 KRW
Labor Ratio
58 %

Unit Price Definition

① Based on concrete placing work by concrete pump truck (80m3/hr or more) (boom placing, slump 15). ② This is the cost for 1 day of placing for a single structure (setting and finishing), and includes cases where two or more adjacent structures are placed continuously within daily working hours. ③ Includes placing preparation and finishing, pump truck placing (setting and finishing), compaction, and curing preparation work. ④ Excludes ready-mixed concrete material cost, and curing and surface finishing costs after concrete placing. ⑤ The material cost for residual concrete generated after placing (residue inside pipes, etc.) shall be separately calculated. ⑥ This unit price shall not apply where placing must be done by pipeline. ⑦ For applicable types by specification, refer below. Classification Type TYPE-1 Structures such as mat foundations with no restrictions on pump truck operation TYPE-2 General structures such as walls, columns, beams, slabs, abutments, and piers TYPE-3 Structures with narrow or deep placing areas that restrict pump truck operation, such as strip foundations and columns and beams of [wall girder] structures without slabs TYPE-4 Structures constructed on cut/fill slopes, etc., where pump truck movement is frequent and pump truck operation is very highly restricted

This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.