Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price for Construction Works · MOLIT Public Notice No. 2026-652
Specification
10m or less, up to 3 months
Unit
m2
Prices by Discipline
This work item code is published with different prices depending on the discipline. Please check the discipline of the relevant project and apply it accordingly.
① Based on the installation and dismantling of steel pipe scaffolding. ② Includes the installation and dismantling of scaffolding and scaffold planks (including movable internal stairs), vertical protective nets around the scaffolding, and safety guardrails. ③ Includes the material cost of steel pipe scaffolding (including planks, internal stairs, and safety guardrails), but excludes the material cost of protective nets. ④ This unit price does not apply when the installation height exceeds 30m.
Unit Price Adjustment
- If the construction period exceeds 3 months, apply by multiplying the following coefficients. Steel pipe scaffolding up to 3 months up to 6 months up to 12 months 10m or less 1.00 1.21 1.63 Standard market unit price over 10m to 20m or less 1.00 1.19 1.57 over 20m to 30m or less 1.00 1.17 1.52 10m or less 1.00 0.83 0.61 Labor ratio over 10m to 20m or less 1.00 0.84 0.64 over 20m to 30m or less 1.00 0.85 0.66
This page is organized from the Ministry of Land, Infrastructure and Transport (MOLIT) H2 2026 Standard Market Price notice data for construction works for search and reference purposes. For actual estimated price calculation and quotations, please be sure to review both the original notice and site conditions together.